Paver Base Calculator

Estimate the gravel base and sand bedding for a patio or path.

Your measurements

Order options

Your estimate

Live calculation
2.84yd³

15% extra material included · sand priced separately

Bedding sand0.62 yd³
Order volume76.67 ft³
Estimated weight4.12 US tons

Calculation & all units

200 ft² × 4 in ÷ 324 × 1.15 = 2.84 yd³

Bedding sand
0.6173 yd³
Order volume
76.6667 ft³
Estimated weight
4.1173 US tons
Whole bags
154 0.5 ft³
Area
200 ft²
Measured volume
2.4691 yd³
Metric volume
2.171 m³
Metric mass
3,735.1372 kg
Volume-based truckloads
1 loads
Measurement planDimensions in feet
A dimension guide for your estimate
Estimate2.84 yd³View result

Calculation method

The gravel base and bedding sand are separate layers. Enter the compacted design depth for gravel and the bedding depth for sand. The extra-volume allowance applies to gravel, while sand is calculated at its entered layer depth.

Gravel yd³ = area × gravel depth ÷ 324 × (1 + allowance ÷ 100). Sand yd³ = area × sand depth ÷ 324.

A worked example

A 100 ft² patio with a 4-inch base and 1-inch sand bed uses 1.23 yd³ of finished gravel and 0.31 yd³ of sand. A 15% gravel allowance gives 1.42 yd³ of gravel.

How to Use the Paver Base Calculator

Measure the area of the intended base and choose the corresponding shape. Where a base extends beyond the paving, use its actual dimensions. Enter the finished aggregate depth separately from the bedding sand depth. Check Order options for the aggregate’s density and the extra gravel allowance. The starting 15% addition is an estimate to edit based on the supplier and specified compaction. Sand volume is calculated geometrically from the entered area and depth. When the layers have different footprints, run the measurements once for each and keep only the result corresponding to that layer. Confirm both depths with the paving system’s installation instructions.

Patio Base with Edge Restraints

A 12 × 16 ft patio has 192 ft² of paving. An illustrative 6-inch base extension on all sides makes the base 13 × 17 ft, or 221 ft². At 4 inches, that is 2.73 yd³ finished aggregate, or about 3.14 yd³ with 15% added. If the bedding stays under the 192 ft² of pavement, estimate the sand for that area separately. Mark the footprint of edge restraints and check whether they require a full-depth compacted support. Save the two volumes with their respective footprints. Then work out the surface units independently in the paver calculator.

Walks with Landings and Steps

Measure the path run and each full-width landing where it turns or reaches a step. A 4 × 32 ft run and a separate 6 × 6 ft landing total 164 ft² if their boundaries do not overlap. At 4 inches, the shared base needs about 2.02 yd³ finished. If the landing needs a thicker section, give it a separate estimate. Set a depth reference before placing base so the finish can stay at the planned height. At stairs, confirm the bedding and riser details instead of using the same depth everywhere. For the surface bedding and joints, compare quantities with the paver sand calculator.

Driveway Pavers and Heavier Loads

Use the load and ground conditions reflected in the pavement design. If a plan specifies 8 inches of compacted aggregate over 600 ft², it calls for 14.81 yd³ of finished base. That volume can require multiple deliveries even when the geometric space looks manageable. Check the seller’s effective truck capacity by both weight and volume. The base may be installed in lifts, but each lift uses part of the same total thickness. Avoid entering the full thickness again for each stage. Use the crushed stone calculator when the base is quoted by aggregate grade and you need a separate weight estimate.

Example Base and Bedding Volumes

The table uses a 100 ft² layer. These are takeoff comparisons, not a prescription for site depth. Net thickness comes from drainage, loading, ground conditions and the product installation. The optional factor shown is for the aggregate order.

Layer example Finished volume At 15% extra
1 in bedding sand 0.31 yd³ Use specified sand quantity
4 in aggregate 1.23 yd³ 1.42 yd³
6 in aggregate 1.85 yd³ 2.13 yd³
8 in aggregate 2.47 yd³ 2.84 yd³

Common questions

How much base for a 10 × 10 ft patio?

At 4 inches the aggregate layer takes 1.23 yd³ finished. A 15% extra allowance raises it to about 1.42 yd³ loose. A separate 1-inch sand bed over that same footprint needs about 0.31 yd³.

How do I compare loose base with compacted volume?

Ask the seller whether their factor is expressed as extra loose volume or as the fraction of loose volume lost. A 15% addition uses × 1.15. A 15% loss uses ÷ 0.85. Start with the finished depth shown in your plan and apply the factor once.

Where do I include the thickness of the pavers?

Add the actual paver thickness to the bedding and base depths to establish the excavation depth. Use only the aggregate thickness for the gravel quantity and only the sand thickness for the bedding quantity. The pavers are counted separately.

Does the allowance apply to sand?

The base calculator applies the extra-volume percentage to gravel only. Sand uses the entered bedding depth.

How deep should the base be?

Use the depth specified for the pavers, loading, soil and climate. The example depths can be changed.

Does this include the pavers?

Use the linked Paver calculator to calculate the surface units. Save both estimates to the same project list.

More bulk & landscape calculators

Browse full directory ↗

Your project list