Calculation method
Select the aggregate grade and enter the finished layer depth. Extra material for compaction is entered as a percentage added to the finished volume. A shrinkage percentage and an added-volume percentage are different quantities.
A worked example
A 10 × 20 ft base at 4 inches is 2.47 yd³ finished. A 15% added-volume allowance gives 2.84 yd³ to order.
How to Use the Crushed Stone Calculator
Measure the area that will receive aggregate, including any extension beyond the surface it supports. Enter the desired finished thickness, then select the stone grade that best matches the quote. Ask the supplier for loose bulk density and a conversion between delivered and compacted quantities for your placement method. Under Order options, replace the planning density and enter an extra-volume percentage if needed. The volume multiplied by loose density gives the delivery weight. For a quote in US short tons use the weight result, and for a volume quote carry the unrounded cubic yard figure into the order discussion.
Driveway Base with a Separate Surface
Measure the aggregate base out to its designed shoulder. A 12 × 48 ft rectangular base at 5 inches has a finished volume of 8.89 yd³. If the seller recommends 15% extra delivered volume, estimate 10.22 yd³ of loose stone. Estimate the surface course as a different layer if it uses a narrower width or another gradation. A truckload of dense-graded base cannot be used to determine the coverage of a separate washed wearing course. Use the gravel calculator for that finish. Ask where each load can be placed without interfering with grade stakes or trapping vehicles.
Aggregate Under a Paved Landing
Use plan dimensions for a compacted aggregate footprint. If a 10 × 12 ft paved area needs an additional 6 inches of base on all sides, the base rectangle is 11 × 13 ft, or 143 ft². At 4 inches thick it needs about 1.77 yd³ before allowance; the paving footprint alone would have given 1.48 yd³. The project design should give the actual edge extension and thickness. Enter the resulting base area as a known area. The paver base calculator keeps aggregate and sand quantities separate when the plans call for both.
Drainage Backfill
A washed, open-graded stone is commonly specified where interconnected voids are needed. Measure the width and depth occupied by aggregate in the design. A 25 ft run with a 12-inch wide and 18-inch tall aggregate envelope holds 37.5 ft³, or about 1.39 yd³, before any pipe displacement. Compare the net stone cross section at outlets and bends where the dimensions change. Ask for the size and fines specification, because two products described with the same nominal top size can drain differently. For a segment behind a retaining wall, use the backfill width confirmed by the wall instructions and estimate each height separately.
Crushed Aggregate Grades
Confirm local grade names. The densities below are editable calculator values, and fines content, water and packing change the scale weight. The estimated ton figures represent a loose cubic yard for comparison.
| Calculator grade | lb per yd³ | Short tons per yd³ |
|---|---|---|
| #57 stone | 2,700 | 1.35 |
| #411 base | 3,000 | 1.50 |
| ¾ inch minus | 2,900 | 1.45 |
Measuring Loose Stone Before Placement
When the base quantity is close to a truckload, ask what the load actually contains before setting the number of trips. A 10 yd³ volume at 2,900 lb/yd³ weighs 29,000 lb, so a nominal ten-yard bed may reach a lower payload limit on that aggregate. A supplier can quote the legal loaded volume of its vehicle. Label your estimate with the ordered gradation and desired finished depth. The crew can then check delivery tickets against the correct loose quantity before spreading it.
Common questions
How much crushed stone do I need for 300 square feet at 4 inches?
The finished layer takes 100 ft³, or 3.70 yd³. An added 15% loose allowance raises it to about 4.26 yd³. At 2,900 lb/yd³ that is about 6.18 short tons. Confirm which density applies to the grade before using that weight.
What is the difference between a 15% addition and 15% compaction loss?
Adding 15% multiplies the finished volume by 1.15. A true loss of 15% of the delivered volume leaves 85% after compaction, so divide the finished quantity by 0.85. In that case the percentage entered under Order options would be about 17.65%.
Is #57 the same as 3/4 inch minus?
No. Gradation and fines content differ. Select the actual material and confirm its bulk density and compaction behavior.
How do I account for 15% shrinkage?
If delivered loose material loses 15% of its volume, divide finished volume by 0.85. This corresponds to a 17.65% added-volume allowance.
Are tons metric?
The primary weight result uses US short tons of 2,000 lb. Metric mass is shown in the detailed result.